Project:

Northern Option Pipeline Project

Client

Total E&P Nigeria Limited

Project Scope

Construction of a 24” diameter pipeline of approximately 50Km in length, between Rumuji Node and Imo River/Owaza Node. Running through areas of swamp, seasonal swamp, river crossings and various other types of crossings.
Installation included HDD (Horizontal Directional Drilling) at 3 river crossings.
Installation of Process Equipment at both node AGI’s (above ground installation)
• Process Gas Dehydration
• Metering Skids
• Fire Water System
• Control Room
• Telemetry Systems
• Power Generation
• Fuel Gas System
• Flare System

Execution Period

Ongoing Project