Project:

OML 58 Upgrade Project

Client

Total E&P Nigeria Limited

Project Scope

OML-58 Upgrade Phase 1. Designed to increase the operating capacity from 10.65 MMSCMD to 15.65 MMSCMD.

Scope of Work included EPC of :

• New Gas Treatment Train
• Two (2) Turbo Generators
• High Pressure Flare System
• Closed Drain System
• Associated Tie-ins to existing Plant
• New Control Systems
• Fire water System
• Associated civil works etc.

Execution Period

From 2008 To 2012