The work scope involves detailed engineering design, procurement, construction and commissioning of the below:
New Drinking Water Storage Tank (T-4503), 1,400m3 gross Capacity and Drinking Water Supply Pump (P-4504E) with the same pump characteristics/capacity as the existing pumps (P-4504A/B).
New Limestone Bed (V-4501E) of the same capacity or characteristic with the existing Limestone Beds (V-4501 A/B)
New Demineralized Water Storage Tank (T-4602), 525m3 gross Capacity
Installation of manual valves on the inlet and outlet headers of the Biological Filters (S-4301A/B/C/D/E/F/G/H) for ease of isolation for maintenance purpose (Four Valves per Bed)
Installation of Online Silica Analyser with three (3) sample connections to monitor Silica breakthrough in Demineralized Water production Units.
Tanks, Vessel & Pump Foundation Design
Tie-ins and interconnection to existing Units & Utilities